Search
Products Case Studies Services & Support Teletrol News About Teletrol Contact Us
Commercial Office Buildings Education Financial Government Healthcare Hospitality Industrial & Manufacturing Stadiums & Arenas Transportation Other

Washington Athletic Club
Seattle, WA

In 1993, an energy audit was conducted and it revealed some conservation measures that made sense to incorporate. Teletrol was chosen for the project, which was to take place in two phases. The savings on their electric bill, coupled with the savings on the steam bill will provide the project with a simple payback of under four years.
Download complete .pdf



 

Reference Installations


Beverly Hills Hotel, Beverly Hills, CA
Cadillac Hotel, Rochester, NY
Century Plaza Hotel, Beverly Hills, CA
College Club, Seattle, WA
Country Club of Rochester, Rochester, NY
Holiday Inn Airport, Richmond, VA
Holiday Inn, Hobby Airport, Houston, TX
Hollywood Renaissance Hotel, Hollywood, CA
Howard Johnsons, VT
International Convention Center, Brunei
Meriden Senior Center, Meriden, CT
Omni Bay Front Hotel, Corpus Christi, TX
Radisson Beach Hotel, Corpus Christi, TX
Regent Beverly Wilshire, Beverly Hills, CA
Salvation Army, Rochester, NY
Shengyang Marriott Hotel, Shengyang, China
Wyndham Hotels, Across USA





· Products · Case Studies · Services & Support · Teletrol News · About Teletrol · Contact Us · Home ·

If you have any questions, comments, or problems regarding this service, please contact us at [email protected].
Copyright ©2002 Teletrol Systems Inc. All rights reserved. Legal Disclaimer

Teletrol Systems Inc., Technology Center, 286 Commercial Street, Manchester, NH 03101
Main Number: (603) 645-6061, Fax Number: (603) 645-6174, e-mail: [email protected]